Directory · North Carolina · Randolph County
Wall Recycling Facility and Construction and Demolition Landfill
Asheboro, NC · Randolph County · Verified Nov 17, 2026
Wall Recycling Facility and Construction and Demolition Landfill is a construction and demolition landfill in Asheboro, Randolph County, North Carolina, at 385 Gold Hill Road. It accepts C&D waste, inert debris, land clearing debris, used asphalt, asbestos, wood waste, concrete. Hours: Monday through Friday 7:30 AM to 4:30 PM. Fees are not published for this facility, so call ahead for pricing. Fees and load acceptance are confirmed at the gate, and a facility can refuse a load after looking at it.
| Facility type | Construction and Demolition Landfill |
|---|---|
| Operator | Wall Recycling LLC |
| Address | 385 Gold Hill Road, Asheboro, NC, 27203 · Directions |
| County | Randolph |
| Phone | 336-871-7777 |
| Website | https://libertywastesolutions.com/locations/asheboro/ |
| Materials accepted | C&D waste, inert debris, land clearing debris, used asphalt, asbestos, wood waste, concrete |
| Materials not accepted | Municipal and industrial waste |
| Restrictions | Maximum 500 tons per day |
| Minimum quantity | Not published |
| Commercial loads | Not published |
| Residential loads | Not published |
| Published fees | Not published |
| Pickup availability | Not published |
| Operating hours | Monday through Friday 7:30 AM to 4:30 PM |
| Permit information | Permit No. 7606-CDLF-2021, Life of Site Permit to Operate issued September 27 2021, expires October 19 2061; Treatment and Processing permit expires October 25 2026 (Permit source) |
| Notes | Formerly Gold Hill Road C&D Landfill. Treatment and Processing permit expiry October 25 2026 is now past as of November 17 2026 while the C&D landfill permit is life of site to 2061. No published tipping fee found. A Liberty Waste Solutions Asheboro Landfill listing shows the same address and is used as the website link because no current Wall Recycling facility page was verified. Contact email is from the NC DEQ inspection report. |
| Information verified | Nov 17, 2026 (Listing source) |
Ask this facility about your load
Send the details below. If the facility has a published email, your request is emailed to it and you get a plain status either way. Nothing here promises acceptance; the facility confirms at the gate. Response time is up to the facility. Construction Load delivers your request but cannot promise if or when the facility replies. If your job is urgent, calling the facility is the fastest route.