Directory · Oklahoma · Carter County
Southern Oklahoma Regional Disposal Landfill
Ardmore, OK · Carter County · Verified Nov 23, 2026
Southern Oklahoma Regional Disposal Landfill is a landfill in Ardmore, Carter County, Oklahoma, at 31 SORD Drive. It accepts Municipal solid waste; non hazardous industrial waste authorized. Hours: Monday to Friday 8:00am to 5:00pm; Saturday 8:00am to 12:00pm. Published fees: 41.65 dollars per ton; minimum charge 25.00 dollars; unsecured load tarp fee 35.00 dollars; car tires 7.00 dollars each; truck tires 12.00 . Fees and load acceptance are confirmed at the gate, and a facility can refuse a load after looking at it.
| Facility type | Landfill |
|---|---|
| Operator | Southern Oklahoma Regional Disposal Inc |
| Address | 31 SORD Drive, Ardmore, OK, 73401 · Directions |
| County | Carter |
| Phone | (580) 226-1276 |
| Website | http://sordlandfill.org/ |
| Materials accepted | Municipal solid waste; non hazardous industrial waste authorized |
| Materials not accepted | Not published |
| Restrictions | Loads that are not tied down and tarped pay an extra fee. Non friable asbestos only with approval per DEQ authorization summary. |
| Minimum quantity | Not published |
| Commercial loads | Yes |
| Residential loads | Yes |
| Published fees | 41.65 dollars per ton; minimum charge 25.00 dollars; unsecured load tarp fee 35.00 dollars; car tires 7.00 dollars each; truck tires 12.00 dollars each (Fee source) |
| Pickup availability | Not published |
| Operating hours | Monday to Friday 8:00am to 5:00pm; Saturday 8:00am to 12:00pm |
| Permit information | Oklahoma DEQ municipal solid waste landfill permit 3510007 |
| Notes | Fee text rests on a secondary summary citing the SORD rates page accessed September 28 2026, which also noted announced tipping fee increases effective July 1 2026; confirm the current rate before hauling. Older directory listings give 2405 Red Cedar Road or 2405 Cedar Road for this site, conflicting with the operator address 31 SORD Drive used here. Explicit construction and demolition acceptance was not published in sources read; acceptance rests on municipal solid waste landfill status. |
| Information verified | Nov 23, 2026 (Listing source) |
Ask this facility about your load
Send the details below. If the facility has a published email, your request is emailed to it and you get a plain status either way. Nothing here promises acceptance; the facility confirms at the gate. Response time is up to the facility. Construction Load delivers your request but cannot promise if or when the facility replies. If your job is urgent, calling the facility is the fastest route.