Directory · North Dakota · Rolette County
Rolla Inert Site
Rolla, ND · Rolette County · Verified Nov 23, 2026
Rolla Inert Site is a inert waste landfill in Rolla, Rolette County, North Dakota. It accepts inert waste; leaves; branches; grass clippings. Hours: Posted windows in October 2026 included Tuesday 5:00 p.m. to 7:00 p.m. and Saturday 1:00 p.m. to 4:00 p.m.; the site was posted closed on November 3 2026. Fees are not published for this facility, so call ahead for pricing. Fees and load acceptance are confirmed at the gate, and a facility can refuse a load after looking at it.
| Facility type | inert waste landfill |
|---|---|
| Operator | City of Rolla |
| Address | Rolla, ND · Directions |
| County | Rolette |
| Phone | Not published |
| Website | Not published |
| Materials accepted | inert waste; leaves; branches; grass clippings |
| Materials not accepted | appliances and electronic waste in the fall clean up notice |
| Restrictions | Visitors dumping more than leaves, branches, or grass clippings must stop by Rolla City Hall to prepay before arriving; City Hall closes at 4:30 p.m.; cash, money order, check, and credit cards accepted per the city notice |
| Minimum quantity | Not published |
| Commercial loads | Not published |
| Residential loads | Yes |
| Published fees | Not published |
| Pickup availability | Not published |
| Operating hours | Posted windows in October 2026 included Tuesday 5:00 p.m. to 7:00 p.m. and Saturday 1:00 p.m. to 4:00 p.m.; the site was posted closed on November 3 2026 |
| Permit information | Not published |
| Notes | Hours are posted per opening window by the city rather than as a standing schedule, and no fee amount or street address was published in the notices read; 2024 council minutes confirm the city operates the inert site and was setting a fee schedule for it |
| Information verified | Nov 23, 2026 (Listing source) |
Ask this facility about your load
Send the details below. If the facility has a published email, your request is emailed to it and you get a plain status either way. Nothing here promises acceptance; the facility confirms at the gate. Response time is up to the facility. Construction Load delivers your request but cannot promise if or when the facility replies. If your job is urgent, calling the facility is the fastest route.