Directory · Mississippi · Yazoo County
City of Yazoo City Rubbish Pit
Yazoo City, MS · Yazoo County · Verified Nov 22, 2026
City of Yazoo City Rubbish Pit is a construction and demolition landfill in Yazoo City, Yazoo County, Mississippi, at 3342 Old Hwy 3. It accepts construction and demolition debris; brick; mortar; concrete; stone; asphalt; wood; metal; roofing; furniture; carpet; cardboard; vegetative debris. Fees are not published for this facility, so call ahead for pricing. Fees and load acceptance are confirmed at the gate, and a facility can refuse a load after looking at it.
| Facility type | Construction and Demolition Landfill |
|---|---|
| Operator | City of Yazoo City, Mississippi |
| Address | 3342 Old Hwy 3, Yazoo City, MS, 39194 · Directions |
| County | Yazoo |
| Phone | 662-746-3211 |
| Website | Not published |
| Materials accepted | construction and demolition debris; brick; mortar; concrete; stone; asphalt; wood; metal; roofing; furniture; carpet; cardboard; vegetative debris |
| Materials not accepted | household garbage; household chemicals; liquids; hazardous waste; asbestos |
| Restrictions | Class I rubbish only; no household garbage |
| Minimum quantity | Not published |
| Commercial loads | Yes |
| Residential loads | Yes |
| Published fees | Not published |
| Pickup availability | No |
| Operating hours | Not published |
| Permit information | MDEQ Class I Rubbish Site Permit R1-059 (Permit source) |
| Notes | FLAG: the MDEQ October 2025 listing marks this facility with an asterisk, denoting a facility either inactive or reported having not received waste during the previous calendar year, and MDEQ encourages contacting the facility before bringing waste. Permitted Class I rubbish site; rowed with that stale activity flag. |
| Information verified | Nov 22, 2026 (Listing source) |
Ask this facility about your load
Send the details below. If the facility has a published email, your request is emailed to it and you get a plain status either way. Nothing here promises acceptance; the facility confirms at the gate. Response time is up to the facility. Construction Load delivers your request but cannot promise if or when the facility replies. If your job is urgent, calling the facility is the fastest route.