Directory · Alabama · Colbert County
Cherokee Industrial Landfill
Cherokee, AL · Colbert County · Verified Nov 20, 2026
Cherokee Industrial Landfill is a industrial landfill in Cherokee, Colbert County, Alabama. It accepts Non hazardous industrial waste and construction and demolition materials in the county commission vote reported in Waste Advantage Magazine. Fees are not published for this facility, so call ahead for pricing. Fees and load acceptance are confirmed at the gate, and a facility can refuse a load after looking at it.
| Facility type | Industrial landfill |
|---|---|
| Operator | Solid Waste Disposal Authority of the Cities of Muscle Shoals and Sheffield and Tuscumbia |
| Address | Cherokee, AL, 35616 · Directions |
| County | Colbert |
| Phone | 256 443 8319 |
| Website | Not published |
| Materials accepted | Non hazardous industrial waste and construction and demolition materials in the county commission vote reported in Waste Advantage Magazine |
| Materials not accepted | Not published |
| Restrictions | Located at Barton Riverfront Industrial Park area in Section 2 Township 4 South Range 13 West. Service area was Colbert County in the ADEM list and a commission vote allowed waste from Alabama and Mississippi and Tennessee and Georgia. |
| Minimum quantity | Not published |
| Commercial loads | Yes |
| Residential loads | Not published |
| Published fees | Not published |
| Pickup availability | Not published |
| Operating hours | Not published |
| Permit information | ADEM Permit No. 17 10 Industrial expiration October 29 2030 in the ADEM preliminary determination read (Permit source) |
| Notes | No street address is published in the sources read so the street field is blank. The Shoals Solid Waste Authority landfill in Tuscumbia is documented as closed in an EPA profile read which says closed for good and directs callers to Barton Landfill and that closed site is excluded as a separate row. Operator changed from CWI Alabama LLC in the 2020 ADEM list to the cities solid waste disposal authority in the 2025 ADEM document and that change is flagged. |
| Information verified | Nov 20, 2026 (Listing source) |
Ask this facility about your load
Send the details below. If the facility has a published email, your request is emailed to it and you get a plain status either way. Nothing here promises acceptance; the facility confirms at the gate. Response time is up to the facility. Construction Load delivers your request but cannot promise if or when the facility replies. If your job is urgent, calling the facility is the fastest route.